arxiv
PublishedJuly 16, 2026 at 4:00 AM
Audited Selective Verification for Risk-Controlled N-1 Thermal Contingency Screening under Deployment Shift
Publisher summary· verbatim
arXiv:2607.13221v1 Announce Type: cross Abstract: Real-time N-1 contingency screening in an energy management system trades assurance against cost: verifying every credible outage with full power flow is too slow, while fast linear-sensitivity screening gives no statistical guarantee and can silentl
Stay posted· Newsletter
A 5-min weekly brief — top movers, price watch, story of the week.
Discussion
No replies yet. Be first.
Related coverage
More from ARXIV
arxivIntegrating High-Level Requirements to Low-Level Tests with Machine-Readable V&V Specifications53marxivLifelong Multi-Subsystem Pickup and Delivery with Buffer-Limited Handover Stations53marxivMXSens: Sensitivity-Aware Mixed-Precision Quantization for Efficient LLM Inference53marxivMobile Network Control with a World Model53mThe Bubble Brief
WEEKLYRead AI insights every Tuesday — top movers, new releases, story of the week.
Originally published on arxiv ↗